Housing and condos

Homeowners pay contractors for half-finished work, then the crew vanishes and no end date is on paper

No builders or owners yet

Bangkok residents October 16, 2026 at 11:06 PM

One homeowner lost an estimated 70,000 to 80,000 baht when a fence contractor walked away half done after the owner also paid for the remaining materials; the contract had no completion date and the mesh was not the brand claimed. Another says a contractor finished about 90 percent, then went unreachable for two days. A thread on why this is common blames owners who can't judge material specs and slow enforcement.

Vote for a challenge

Is this you?

If you run into this every week, tell us. Teams only build for challenges with someone waiting for the tool.

0ready to build

Members only. Apply to join.

Next build day

No date yet. Join and we'll tell you first.

Join

This is me

Only organizers see it

Privacy

5 ways to tackle it

  • Web portal

    Milestone Contract Builder: pay when the photo proves it

    The page builds a contract with scope, a materials list, an end date and stage payments tied to photo proof. The owner prints it and both sign before the first baht moves.

    Build with Next.js, Claude, PDF generator, PromptPay QR

  • Camera and vision

    Material Check: photograph the mesh, wire or label and compare with the contract

    The owner photographs delivered materials and their labels. Claude vision reads brand, gauge and grade and compares them with the contract's materials list. A fence mesh that was not the brand claimed gets flagged on delivery, not three weeks later.

    Build with Claude vision, Thai OCR, PWA

  • Hardware and sensors

    Site Cam: a cheap solar camera that snaps the site at 8 AM and 5 PM every day

    An ESP32-CAM on a pole photographs the work site twice a day and posts the photos with timestamps to the owner. The owner sees when the crew showed up and how far the work really is, and a crew that vanishes leaves a clear record.

    Build with ESP32-CAM, solar panel, LiPo battery, Wi-Fi or SIM, simple gallery page

  • AI agent

    Quote Sanity Agent: compare three quotes line by line

    The agent reads PDF or photo quotes, normalizes items and flags missing work and unit prices far from the others. It shows the cheapest quote leaving out the footing, so a low price is not misread as a good one.

    Build with Claude, PDF and photo upload

  • Data and maps

    Contractor Record Book: finished on time or not

    Owners add job type, price, whether the contract had an end date and whether it finished. Others search by contractor name or phone before hiring, with a QR on finished jobs so the next neighbor can add theirs.

    Build with Next.js, Supabase, QR yard sign PDF

What people reported

  • Homeowner's fence contractor finished half, owner paid for the remaining materials, contractor became unreachable; estimated loss 70,000 to 80,000 baht; contract had no completion date; claimed mesh brand was denied by the company.

    pantip.com
  • Owner says contractor finished about 90 percent, about 10 percent unpaid, and has been unreachable by phone and LINE for two days; asks whether to terminate and whether photos and a police diary entry are enough.

    pantip.com
  • Thread asking why construction abandonment is so common; commenters cite owners unable to judge specs, inflated withdrawals, underbidding and slow civil enforcement.

    pantip.com

Bring a challenge

If this is your organization's challenge, the winning team may build it for you.